NOTICE OF WORK - Bldg 200 Pedestrian Route Now Open

Health & Science Centre (Parking Lot D): The pedestrian route in front of Bldg 200 is now open. Excavation is continuing. No blasting is anticipated, but the excavation will cause noise to the surrounding areas. A planned natural gas shutdown to buildings 200 to 395 (inclusive) will take place Friday April 28, 2017 starting at 7 am in a progressive manner (building by building) with the last building being turned off by 4pm that day.  Gas will be reinstated Sunday April 30, 2017 late afternoon. 

For barrier free travel between the bus loop and cafeteria levels please use the new concrete ramp on the East side of Bldg 300 adjacent to the bus loop and follow the signage in place to use the elevator inside Bldg 300 to exit on to 3rd floor level. 

GeoExchange Energy System Project (Parking Lot C, Q, R & Navy League Building): This project is ongoing. Fencing & signage will remain until project completion. 

Automotive Marine Trades Reconfiguration (Bldg 150 and Parking Lot U): Construction begins Monday, May 1, at Automotive Bldg.150. There are no anticipated impacts to the VIU community at this early stage 

For more information on these projects please visit: www.viu.ca/campus-development or contact Facilities at 250-740-6500 or facility@viu.ca

Related Posts

MENU
CLOSE X Campus Development